| 1 | BIANNUAL WORK CONTRACT TO CARRY OUT DAY TO DAY MAINTENANCE WORKS PERTAINING TO BATTERY SETS OF UNIT#5 500 MW KHAPERKHEDA | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 2 | ANUUAL CONTRACT FOR ASSISTANCE TO C &I STAFF FOR MAINTENANCE OF C & I SYSTEM OF 500MW UNIT, KHAPERKHEDA. | C&I-II | MSPGCL, KHAPERKHEDA |
| 3 | BIENNIAL WORK CONTRACT FOR OPERATION & MINOR MAINTENANCE OF VARIOUS DS SYSTEM AND OPERATION OF AIR COMPRESSOR FOR BOBR EVACUATION HPDS SYSTEM FOR WAGON TIPPLER NO.1 & 2 AND ALLIED WORK ASSISTANCE FOR BUNKER OPERATION | CHP-I | MSPGCL, KHAPERKHEDA |
| 4 | BIENNAL WORK CONTRACT TO CARRAYOUT DAY TO DAY WORK OF FIRE FIGHTING SECTION AT KHAPERKHEDA TPS | FIRE FIGHTING | MSPGCL, KHAPERKHEDA |
| 5 | ANNUAL CONTRACT FOR PROVIDING OF ASSISTANCE TO TECHNICAL STAFF OF TEST-II DURING A/B/C & GENERAL SHIFTS AT U#5 | TESTING-II | MSPGCL, KHAPERKHEDA |
| 6 | ANNUAL WORK CONTRACT FOR THE ASSISTANCE TO CARRY OUT VARIOUS WORKS PERTAINING TO CHPEM-I. | CHP-I | MSPGCL, KHAPERKHEDA |
| 7 | ANNUAL WORK CONTRACT FOR ASSISTANCE TO CARRY OUT VARIOUS ELECTRICAL MAINTENANCE WORKS OF COAL HANDLING PLANT-II (500 MW) TPS KHAPERKHEDA | CHP-II | MSPGCL, KHAPERKHEDA |
| 8 | BIENNIAL WORK CONTRACT FOR COLONY LIGHTING MAINTENANCE FOR KHAPERKHEDA TPS. | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 9 | ANNUAL WORK CONTRACT FOR PREVENTIVE MAINTENANCE, OVERHAULING OF LT MOTORS AND OTHER ALLIED WORKS IN CHP-I, TPS KHAPERKHEDA. | CHP-I | MSPGCL, KHAPERKHEDA |
| 10 | WORK CONTRACT FOR PREVENTIVE MAINTENANCE, & OVERHAULING OF LT MOTORS AND OTHER ALLIED WORKS IN CHP-II, TPS KHAPERKHEDA. | CHP-II | MSPGCL, KHAPERKHEDA |
| 11 | ANNUAL RATE CONTRACT FOR MAINTENANCE OF MAIN PLANT LIGHTING,MAINTENANCE & COLONY STREET LIGHTING,HT/LT CABLE LAYING WORK IN PLANT & COLONY AT 210 MW KHAPERKHEDA TPS | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 12 | BIANNUAL CONTRACT FOR MAINTENANCE OF MAIN PLANT LIGHTING,STREET LIGHTING,LT MOTOR MAINTENANCE,OVERHAUL & ALLIED WORKS & CABLE LAYING WORK OF MAIN PLANT & ODP FOR EM-II AT U#5 (500 MW) KHAPERKHEDA TPS | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 13 | BIENNAIAL WORK CONTRACT FOR MISCELLANEOUS SERVICE REQUIRED AT UNIT-5 500 MW KHAPARKHEDA TPS. | OS-II | MSPGCL, KHAPERKHEDA |
| 14 | BOILER & TURBINE SIDE HT MOTOR OVERHAUL OFU#1 TO U#4 ON AS WHEN REQUIRED BASIS AT 210 MW KHAPERKHEDA TPS | CHP-I | MSPGCL, KHAPERKHEDA |
| 15 | WORK CONTRACT FOR SERVICING AND MAINTANANCE OF HT CIRCUIT BREKERS /[PANEL DURING AOH OF U#5 (500MW) KHAPERKHEDA TPS. | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 16 | WORK CONTRACT FOR SERVICING OF LT BOARDS AND BREAKERS DURING AOH OF U#5 FOR EM-II 500MW KHAPARKHEDA TPS | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 17 | ARC FOR LIFTING,SHIFTING OF LT MOTOR ,RECTRIFORMERS AND OIL DRUMS AT KHAPERKHEDA | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 18 | AMC OF TURBINE & BOILER SIDE LT MOTOR ON AS WHEN REQUIRED BASIS AT 210 MW TPS KHAPERKHEDA | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 19 | OIL FILTERATION AND OIL TOP UP WORKS OF HT AND LT TRANSFORMER OF UNIT # 1TO 4 ON AS AND WHEN REQUIRED BASIS AT 210 MW TPS KHAPERKHEDA. | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 20 | WORK OF RENOVATION AND REWAMPING OF STREET LIGHTING SYSTEM IN 210 MW INTAKE PUMP HOUSE, WAREGAON ASH BUND AND PLANT & COLONY PERMISES AT KHAPERKHEDA TPS. | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 21 | TURBINE AND BOILER SIDE LT MOTOR OVERHAUL OF U#1 DURING OVERHAUL OF UNIT AT 210 MW TPS KHAPERKHEDA | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 22 | TURBINE AND BOILER SIDE LT MOTOR OVERHAUL OF U#3 DURING OVERHAUL OF UNIT AT 210 MW TPS KHAPERKHEDA. | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 23 | BOILER & TURBINE SIDE HT MOTOR OVERHAUL OFU#1 TO U#4 ON AS WHEN REQUIRED BASIS AT 210 MW KHAPERKHEDA TPS | ELECTRICAL MAINTENANCE | MSPGCL, KHAPERKHEDA |
| 24 | ANUUAL WORK CONTRACT FOR COMPLETE OVERHAULING OF HT MOTORS INSTALLED AT 3 X 660 MW KTPS, KORADI ON AS AND WHEN REQUIRED BASIS. | ELECTRICAL MAINTENANCE | MSPGCL, KORADI |
| 25 | ANUUAL WORK CONTRACT OF COMPLETE OVERHAULING AND SHIFTING OF HT MOTOR INSTALLED AT 210 MW KTPS | ELECTRICAL MAINTENANCE | MSPGCL, KORADI |
| 26 | WORKS CONTRACT FOR CABLE LAYING,TERMINATION,JOINITING,TRENCH EXCAVATION WORK AND OTHER ELECTRICAL WORKS ETC.( AS AND WHEN REQUIRED ) AT 3X660 MW KORADI TPS FOR TWENTY FOUR (24) MONTHS | EM&T | MSPGCL, KORADI |
| 27 | MANPOWER ASSISTANCE CONTRACT FOR ELECTRICAL MAINTENANCE & TESTING AND C&I EQUIPMENT OF UNIT 8,9 & 10 AT 3X660 MW KTPS KORADI FOR TWO YEARS | I&C | MSPGCL, KORADI |
| 28 | BIENNIAL MAINTENANCE CONTRACT FOR BTG AND BOP (EXCEPT CHP) FOR ELECTRICAL AND C&I OF UNIT 8, 9 & 10 AT 3 X 660 MW, KTPS, KORADI. | EM&T | MSPGCL, KORADI |
| 29 | BILL FOR WORK CONTRACT FOR MAINTENANCE OF STREET LIGHTS INSTALLED AT KTPS COLONY, KORADI. | ELECTRICAL MAINTENANCE | MSPGCL, KORADI |
| 30 | ANNUAL WORK CONTRACT OVERHAULING OF 415V LT MOTOR FOR BELT COVNVEYORS OF CHP-A FOR 2 YEARS | CHP-B | CSTPS CHANDRAPUR |
| 31 | ANNUAL WORK CONTRACT FOR WIRING AND PROVISION OF ELECTRIC SUPPLY AT CSTPS CHANDRAPUR | ELECTRICAL MAINTENANCE | CSTPS CHANDRAPUR |
| 32 | PERIODICAL MAINTENANCE WORKS IN ELECTRICAL MAINTENANCE OF CHP AREAS OF NTPC RAMAGUNDAM FOR 24 MONTHS PERIOD | CHP | NTPC RAMAGUNDAM |
| 33 | ANNUAL CONTRACT OF CHP HOUSEKEEPING AND OPERATION ASSISTANCE WORK (PACKAGE-3) AT
NTPC RAMAGUNDAM | CHP | NTPC RAMAGUNDAM |
| 34 | STREET LIGHT INSTLLATION WORKS NTPC MOUDA BOUNDARY ROAD | ELECTRICAL MAINTENANCE | NTPC MOUDA |